Project

OMUKISA water

The children at OMUKISA center and the surrounding community do not have enough water to cover their basic needs.

With the OMUKISA water project we want to change this reality and ensure that all of them have safe drinking water.

rafsdesign-rafs.gif

01. Actual context

The area where the Omukisa center is located only has this public well:

Problems

  1. It does not have enough extraction capacity.

  2. It dries up often.

  3. There are long waiting lines.

  4. It is far away.

  5. The water is not always in good condition.

There are 6 months drought in Uganda.

And when it does rain, only few people have rainwater collection and storage systems.

ruleta meses ing.png

02. Objectives

Build a well with a solar-powered pump in Omukisa.

​

​

Store water in a tank and distribute it by gravity.

​

​

Work with local labor and local resources.

​

​

Raise awareness and generate citizen participation.

​​​

The community will be able to use the water from the well for FREE and WHENEVER they need it.

03. Planning and budget

FEBRUARY

MARCH

APRIL

MAY

JUNE

Previous study

Start fundraising

Continue fundraising

Continue fundraising  

Hydrogeological study, to know the exact point where the drilling will be carried out and the type of soil.................................................................................

Arrival of Blanca and Anna to Iganga........................................................................

Drilling..........................................................................................................................

Pumping test...............................................................................................................

Water quality test ......................................................................................................

Support construction of the water tanks................................................................

Placing the water tanks .............................................................................................

Installation of the pump.............................................................................................

Installation of solar panels.........................................................................................

Sealing of the well.......................................................................................................

Assembly of the distribution system........................................................................

Return of Blanca and Anna to Spain.........................................................................

​

​

Study and evaluation of the impact

Recording and disclosure of results

430€

1,000€

2,560€

500€

500€

1,500€

830€

900€

2,860€

394

2,295€

1,000€

Administrative costs............

14,769€

1,726€â€‹

16,495€

If you want us to send you more detailed information

04. Final degree projects

Anna:  Water extraction with Stirling engine.